PROJECTS
Here you will find our latest projects from various, satisfied clients. Click a project below to view how it all started.
Application for 11kV temporary supply
After assisting MWM in applying for connection of its proposed 25 MW Energy from Waste Facility to the local DNO network. A temporary 11 kV 1.5 MW supply to the site was also required in order to provide power during the plant construction phase.
G5/4 Harmonics assessment for electric transport
Ennoidgy limited provided consultancy service to assess the prospective harmonic distortion due to the connection of the East London line to the DNO grid connection points and other relevant substations.
Oil and gas company in Bahrain
Provided investment appraisal and road map for gas processing plant’s 100% increase in capacity. Services included; Assessment, visual inspection, and data collection of existing infrastructure system.
Grid connection, design and system studies including G5/4 harmonics assessment and P28 voltage fluctuation study
Connection of a client’s new research laboratory in Bristol to the DNO’s network. The services included; Innovative design of a 33/11kV substation to DNO and client specification.
Grid connection application for Javelin Park – Junction12 on M5 Gloucestershire
Provided consultancy service to investigate grid connection options for an energy from waste plant near Javelin Park, Junction12 on M5, Gloucestershire. Services included.
Design management and governance support
Consultancy services provided for large capital project. Client required a temporary supply of 30MVA to power two no. off tunnel boring machines in Wiltshire.
Design review, assurance, and management for projects and grid connection
Provided design management consultancy service including design reviews and assurance for multiple number of projects and grid connections including
Keith To MACDUFF 132KV Upgrade Now Energised
Almost two months ahead of schedule and over £3m under budget, the Keith MacDuff 132kV circuit upgrade has now been energised. The line now has 180MVA capacity from 90MVA