Grid connection, design and system studies including G5/4 harmonics assessment and P28 voltage fluctuation study
Connection of a client’s new research laboratory in Bristol to the DNO’s network. The services included;
Innovative design of a 33/11kV substation to DNO and client specification.
Material schedule and specification of required HV plant items.
System study to confirm compliance with DNO specification including Power flow, fault level, G5/4 harmonic assessment, voltage fluctuation, protection design philosophy, and arc flash hazard analysis.