Application for 11kV temporary supply

After assisting MWM in applying for connection of its proposed 25 MW Energy from Waste Facility to the local DNO network. A temporary 11 kV 1.5 MW supply to the site was also required in order to provide power during the plant construction phase.

By |2020-05-25T19:37:29+00:00May 19th, 2020|projects|Comments Off on Application for 11kV temporary supply

G5/4 Harmonics assessment for electric transport

Ennoidgy limited provided consultancy service to assess the prospective harmonic distortion due to the connection of the East London line to the DNO grid connection points and other relevant substations.

By |2020-05-25T19:41:29+00:00May 19th, 2020|projects|Comments Off on G5/4 Harmonics assessment for electric transport

Grid connection, design and system studies including G5/4 harmonics assessment and P28 voltage fluctuation study

Connection of a client’s new research laboratory in Bristol to the DNO’s network. The services included; Innovative design of a 33/11kV substation to DNO and client specification.

By |2020-05-25T17:18:05+00:00May 9th, 2020|projects|0 Comments

Grid connection application for Javelin Park – Junction12 on M5 Gloucestershire

Provided consultancy service to investigate grid connection options for an energy from waste plant near Javelin Park, Junction12 on M5, Gloucestershire. Services included.

By |2020-05-25T17:45:48+00:00May 9th, 2020|projects|0 Comments